๐งฎ Customisable Risk Scoring: The scale for probability and impact can now be customised along with the risk appetite of the organisation.
๐ ๏ธ Custom Frameworks and Requirements: You can now add custom frameworks and requirements. Note: Requirements can no longer be added to the built-in frameworks.
๐ Regulations Renamed to Frameworks: Regulations are now called frameworks.
๐ฅ๏ธ New “Technical” Category for Controls: Added a new category “Technical” for Controls.
๐ New Status “Planned” for Assets: Assets now have a new status called “Planned”.
๐ Default Task Frequency Changed: The default task frequency is now Annual instead of Once.
๐ Enhanced List View Searches: List view searches now also include Label and label group names.
๐๏ธ Improved Sorting for All Item Lists: Troubled items are always sorted to the top. For example, risks with the highest score needing mitigation and failing controls are shown first.
๐ ๏ธ Control Status Logic Update: Updated the logic for determining control status.
Control Status Logic:
Control is Implemented IF: โ There is at least one completed (Done) task attached. ๐ There is at least one recurring task attached. (This can be achieved by scheduling a recurring task and completing its first instance).
Otherwise, Control is Not Implemented.
Control is Failing IF: โฐ Any task connected to the control is overdue. ๐ OR the most recent completed (Done) task is a failed Audit type task.
Otherwise, Control remains Implemented.
Paint icon byย Dooderย via SVGRepo CC BY